  • Client: Hudson River Park Trust
  • Location: New York, NY
  • Project Cost: $4,300,000 (combined)
  • Start Date: 6/2007
  • End Date: 9/2008

Description:

 

Illustrating its versatility, J-Track has already completed several waterfront projects in its short history.  At Pier 62 & 63 J-Track was involved in the construction of bulkheads (above and below the water line), the construction of the cast in place elements of the pier structure, and the digging of trenches. The projects called for the pouring of over 10,000 cubic yards of concrete during both the winter and summer seasons. The job was valued at $ 2.2 million.

For the Pier 86 Waterfront Structures, J-Track was involved in the construction of bulkheads (above and below the water line), the construction of the cast in place elements of the pier structure, and the digging of trenches. The project was valued at over $ 2 million.

The Pier 86 project won an award of merit from New York Construction Magazine in the “Best of 2008” contest.