Projects

Completed Projects

High Pressure Natural Gas Service at 207th Street Yard

Install new high pressure natural gas line at NYCT 207th St Yard. Install new reel rack and gas pad for

View Details

Cortlandt Street Station #1 Line Broadway - 7th Ave Line

Replace 2,433 feet of existing track with new type II modified track.

View Details

Rehabilitation of the Steinway Tube Tunnel

Demolition of duct bank and installation of new duct for new cable in Steinway Tube for the 7 line between Grand Central Terminal and Vernon/Jackson.

View Details

College Point Bus Depot

Work under this contract includes the installation of a fiberglass splash wall, reconfiguration of the bay’s drainage system, installation of new bay lighting, removal of the bay’s existing bus lift system, and installation of a new hydraulic lift system capable of lifting a 45,000 pound bus.

View Details